Amber School / Action Daycare Paving
Prepared plans to repair, sealcoat, and restripe several acres of playgrounds and parking lots
Prepared plans to repair, sealcoat, and restripe several acres of playgrounds and parking lots
U&R revitalized and optimized an existing parking lot to enhance safety during pick-up and drop-off, streamline traffic flow, and improve parking accessibility. This reconstruction project incorporates modern design, technology integration, and sustainable elements to create a safer, more efficient, and
U&R worked with CAW Architects and the Portola Valley School District as a part of the Measure Z bond to take part in rebuilding the innovation rooms at Ormondale Elementary School. This project included an addition to the school that
U&R partnered with Hoover Elementary to address the persistent flooding issue caused by an outdated storm drainpipe. Through careful surveying and collaboration with multiple stakeholders, U&R designed an innovative catchment solution utilizing a gross solids removal device (GSRD), resulting in
U&R was included in this site modernization to improve the existing student drop off to utilize a one-way traffic flow through the school property. This traffic improvement included revising the teacher and visitor parking. Site walkways were upgraded to meet
U&R worked with HY Architects, Inc. on the San Rafael High School STEAM Building project. This project consisted of a brand new 18,560 square foot Science, Technology, Engineering, Arts and Math building with U&R providing the civil engineering site services.
U&R worked with K2A Architecture + Interiors to design this ocean-themed ADA accessible play structure at the Ocean Shore Elementary School of Pacifica School District, in Pacifica, California.
New exterior walkways, landscaped courtyards and outdoor gathering spaces to make the old campus more beautiful and ADA accessible.
The modernization of an elementary school campus that was constructed in phases over a period of two years.
A new classroom building addition was completed on the campus of this community college.