Education

Birch Grove Primary School parking lot design.

Birch Grove Primary School

U&R revitalized and optimized an existing parking lot to enhance safety during pick-up and drop-off, streamline traffic flow, and improve parking accessibility. This reconstruction project incorporates modern design, technology integration, and sustainable elements to create a safer, more efficient, and

Read More »

Ormondale Elementary School

U&R worked with CAW Architects and the Portola Valley School District as a part of the Measure Z bond to take part in rebuilding the innovation rooms at Ormondale Elementary School. This project included an addition to the school that

Read More »

Hoover Elementary School

U&R partnered with Hoover Elementary to address the persistent flooding issue caused by an outdated storm drainpipe. Through careful surveying and collaboration with multiple stakeholders, U&R designed an innovative catchment solution utilizing a gross solids removal device (GSRD), resulting in

Read More »

Novato Unified School District

U&R was included in this site modernization to improve the existing student drop off to utilize a one-way traffic flow through the school property. This traffic improvement included revising the teacher and visitor parking. Site walkways were upgraded to meet

Read More »

San Rafael High School STEAM Building

U&R worked with HY Architects, Inc. on the San Rafael High School STEAM Building project. This project consisted of a brand new 18,560 square foot Science, Technology, Engineering, Arts and Math building with U&R providing the civil engineering site services.

Read More »

Ocean Shore Elementary School

U&R worked with K2A Architecture + Interiors to design this ocean-themed ADA accessible play structure at the Ocean Shore Elementary School of Pacifica School District, in Pacifica, California.

Read More »